DSH-เอกสารจาก MRC

newupdateเอกสารภาษาอังกฤษ ที่เกี่ยวข้องกับกระบวนการ PNPCA โครงการเขื่อนดอนสะโฮง ของ สปป.ลาว


Key MRC documents:

Main Report of the Technical Review for the Prior Consultation process of the Don Sahong Hydropower Project

 


Annexes of the Technical Review Report

Annex A1: Prior Consultation Road Map

Annex A2: List of International, Regional and MRCS Expert contributors

Annex B: Alignment with the MRC PDG

Annex C: Fisheries Report

Annex D: Dolphin Report

Annex E: Hydrology and Hydraulics Report

Annex F: Water quality and Ecosystems Report

Annex G: Sediment Report

Annex H: Sediment Report

 


Comments provided by NMCs after the Special Session of the Joint Committee on 28 January 2015

Comment by LNMC after the SS JC on TRR

Comment by LNMC after the SS JC on FEG Annex

Comment by TNMC after the SS JC on TRR

Guidelines on the implementation of the PNPCA

PNPCA Procedures

The preliminary Design Guidance agreed by MRC Joint Committee on:

  • Fisheries
  • Sediment Management
  • Water Quality
  • Navigation
  • Safety of Dams

Reply Form to Prior Consultation

Reply Form, Cambodia
Reply Form and letter, Thailand
Reply Form, Viet Nam
Lao PDR’s statement of PNPCA DSHHP

 


Quick links:

» Frequently Asked Questions

» Road map

 


Regional Public Consultation, 12 Dec 2014

Report PNPCA regional public consultation on DHSPP

National Report on Information Sharing on Don Sahong Hydropower Project in Thailand

Report on National Public Consultation for Don Sahong Hydropower Project in Viet Nam

» Opening Speech by CEO of MRC Secretariat

1995 Mekong Agreement and PNPCA Process by MRCS CEO

DSHPP – mitigating potential impacts by Mr. Graeme (MegaFirst Consultant)

DSHPP – monitoring fish and fisheries at Khone Falls by Mr. Kent (MegaFirst Consultant)

DSHPP – Sediment and hydrology by MegaFirst Consultant

Technical Review by MRCS

Statetatement from Save the Mekong Coalition(Eng)

Statetatement from Save the Mekong Coalition (Khmer)

Statetatement from Viet Nam Rivers Network

Site visit tentative programme 11-Dec-2014

Background and Programme
(updated:12-Dec-14)

Briefing Note on Technical Review

About the Don Sahong Hydropower Project

 


Related Information

Cumulative Impact Assessment
Evironmental Impact Assessment
Environmental Management and Monitoring Plan
Social Impact Assessment
Social Management and Monitoring Plan
Resettlement Action Plan (RAP)
Annex C to the 2013 EIA– Report on Fisheries Study in Hou Sahong, Hou Sadam and Hou Xang Pheuak (2010)
Annex D to the 2013 EIA – Report on Fisheries Study in Hou Sahong, Hou Sadam and Hou Xang Pheuak (2010-2012)
Engineering Status Report Vol.1
Engineering Status Report Vol.2

 


The project developer also makes available relevant data and information, and provides updates on the project on its websitehttp://dshpp.com

 


รายละเอียดเพิ่มเติม สามารถหาได้จากเว็บไซต์ของ คณะกรรมาธิการแม่น้ำโขง หรือลิงค์ http://www.mrcmekong.org/news-and-events/consultations/don-sahong-hydropower-project/

 



© 2016 สำนักเลขาธิการคณะกรรมการแม่น้ำโขงแห่งชาติไทย